University Center – College of Lake County

College of Lake County     Grayslake, Illinois

The three story, 91,000 SF University Center contains two computer labs, two distance learning labs, a science lab, a tiered lecture hall, a nursing lab, a library, and a theater-style lecture hall. The new University Center of Lake County classroom building is located on CLC’s Grayslake Campus, at 1200 University Center Drive.                                                                   

Property Condition Assessment, Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Site and Utility Layout, Development Constraint Report, Site Circulation and Parking, Preliminary Engineering, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Regulatory Compliance Review.

Willow Creek Church – 7,300-seat Auditorium

Willow Creek Church     Barrinton, Illinois

The onsite and offsite site improvements for the new auditorium and office/classroom wing included the conversion of an existing deep & shallow well system to a proposed potable Water Main System with booster station and 2,600 linear feet of offsite water main.  The building additions required the relocation of existing utilities; the reconfiguration of access and parking facilities; capacity analysis and existing lift station pump modifications; and a water network analysis of the municipal system.

Gross/Pasma Blomquist Architects. Pepper Construction. Contact Scott Troeger, 847-765-0100

Property Condition Assessment, Conceptual Utility Layout, Development Constraint Report, Wastewater Capacity Analysis, Wastewater Master Planning, Water Master Planning, Final Engineering Construction Documents, Utility Services Layout, Wastewater Collection System, Wastewater Lift Station, Water Distribution System, Water Network Analysis, Regulatory Compliance Review

Wolters Kluwer Financial – Campus Improvements

Wolters Kluwer Financial       Riverwoods, Illinois

A building expansion of the corporate campus required investigation and design of storm water drainage and vehicle capacity modifications.  Site Improvements included a 300-car parking lot expansion, Hydraulic analysis of the existing campus drainage system, reconstruction of the signalized campus entrance and offsite roadway widening of Lake Cook Road.                                                                                                                                                                                              

Drainage Study, Floodplain investigation, Property Condition Assessment, Drainage Plan, Site Circulation and Parking, Detention/Retention Basins, SWPPP and Best Management Practices, Right of Way Exhibits, Stormwater Management System, Drainage System Restoration, Final Engineering Construction Documents

Knight Transportation Headquarters – Site Improvements

Knight Transportation      Phoenix, Arizona

The improvements for the 80-acre corporate office building expansion including parking lot expansion and reconfiguration of onsite  vehicle traffic; the installation of an 8 foot segmented block retaining wall , parking lot lighting system and pedestrian system.

Conceptual Drainage Plan, Conceptual Site and Utility Layout, Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation , Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Fermilab – Access Roadway Alignment

Fermi National Accelerator Laboratory           Batavia, Illinois

The project consisted of investigative field work and establishment of various access roadway alignments for proposed grading and paving improvements to the campus access roadway system. The main focus of the investigation was on Road A and Road C to align with the main Research & Development facility.

Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Roadway alignment

Abbott Laboratories – Campus Access Road Investigation

Abbott Laboratories       Abbott Park, Illinois

The Research & Development campus Master plan required site investigation services to establish roadway alignments for proposed access road improvements and main entrance modifications for future vehicle level of service..  The campus is located at 100 Abbott Park Road.

Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Roadway alignment, Site Circulation and Parking, Preliminary Engineering

Lincolnwood Place – Nursing Home

Lincolnwood Place      Lincolnwood, Illinois

The project consisted of the rough grading and utility extensions to the out-lot parcel for a future multi-story nursing home facility.  The infrastructure and grading were based upon an analysis of a  retrofit building design.

Pad-ready Drainage Plan, Site Retrofit, Utility Services Layout, Final Grading Construction Documents

Nursing Division Facility – Site Improvements

Village of Schaumburg      Schaumburg, Illinois

The project site design included the expansion and reconfiguration of the existing parking lot. Site improvements included: relocation of site lighting and re surfacing of the facility access road.

Drainage Plan, Site Circulation and Parking, Final Engineering Construction Documents, Bid Procurement, Contract Administration

Arden Courts of Northbrook

HCR  Manorcare          Northbrook, Illinois

A creativity and innovative approach was required to achieve the site improvements surrounding the intricate building design and the problematic parcel configuration.  The result is a campus that looks and functions beautifully.  The site is located at 3240 Milwaukee Avenue.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Detention Basins, Erosion Control and Best Management Practices, Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Condell Medical Center – Parking Expansion

Advocate Condell Medical Center           Libertyville, Illinois

The 250,000 sq.ft. building addition to the Condell Medical Center campus required the reconfiguration and expansion of the existing parking lot.  Paving and grading plans were designed to achieve the required parking per the zoning regulations.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Final Engineering Construction Documents