Kampgrounds of America – Infrastructure Improvements

Neil Borkan-Developer       Iron River, Michigan

Roadway and utility infrastructure improvements on a 1,200-acre parcel for a proposed campground facility with a Main Guard Station, Motel, Clubhouse, Cabin area, RV area, and Tent area.  Design services included: sanitary and water main extensions; Mass grading plan; Rural collector road infrastructure and service access aisle to various facility areas; parking lots and site circulation, Open-ditch storm water management system, and the preparation of final construction documents, details and specifications. Contact: Neil Borkan, 1020 Milwaukee AVE Suite 360, Deerfield, IL

Property Condition Assessments, Conceptual Drainage Plan, Conceptual Utility main and service Layouts, Site Circulation, Wastewater Capacity Analysis, Wastewater Master Planning, Water Master Planning, Water Resource Planning, Preliminary Drainage Report, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management Systems, Utility Services Layout, Wastewater Collection Systems, Wastewater interceptor improvements, Water Distribution Systems, Water Network Analysis, Water Transmission Mains, Drainage System Restoration, Plan Quantities, Estimate of Probable Cost

 

Phoenix College – Campus Parking Structure

Phoenix College      Phoenix, Arizona

The project consisted of a proposed 350-car parking garage and the reconfiguration of the existing at-grade parking lot. Services included site investigation of the existing campus and preliminary layout to maximize the cost benefit of a multi-story parking garage.

Property Condition Assessment, Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Site and Utility Layout, Development Constraint Report, Site Circulation and Parking, Preliminary Engineering

The streets of Woodfield – Infrastructure Improvements

The Tucker Company         Schaumburg, Illinois

Formerly One Schaumburg Place, included the design of site improvements for enclosed retail mall, 2 parking garages and 7-story office building and a proposed hotel. The offsite infrastructure improvements included the widening of 2 existing IDOT roadways along IL Route 53 frontage road and Higgins Road, the extension of Martingale Road, the abandonment of an existing lift station, and the rerouting of a 54 inch storm sewer; design of a 350-car parking lot. The design included the extension of the existing sanitary and watermain system and the construction of 2 detention facilities

P1250.90

Site Circulation and Parking, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Water Distribution System

Judson University – Lindner Fitness Center

Judson University      Elgin, Illinois

The design of site improvements were for a new 150,000 square foot recreation facility in the center of the college campus.  Services included the design of utility infrastructure improvements, the design of an access road and the proposed parking lot.

Contact: Joe Evers, City Engineer of Elgin

Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation, Stormwater Management System, Utility Services Layout, Drainage System Public Participation coordination, Final Engineering Construction Documents

University Center – College of Lake County

College of Lake County     Grayslake, Illinois

The three story, 91,000 SF University Center contains two computer labs, two distance learning labs, a science lab, a tiered lecture hall, a nursing lab, a library, and a theater-style lecture hall. The new University Center of Lake County classroom building is located on CLC’s Grayslake Campus, at 1200 University Center Drive.                                                                   

Property Condition Assessment, Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Site and Utility Layout, Development Constraint Report, Site Circulation and Parking, Preliminary Engineering, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Regulatory Compliance Review.

Wolters Kluwer Financial – Campus Improvements

Wolters Kluwer Financial       Riverwoods, Illinois

A building expansion of the corporate campus required investigation and design of storm water drainage and vehicle capacity modifications.  Site Improvements included a 300-car parking lot expansion, Hydraulic analysis of the existing campus drainage system, reconstruction of the signalized campus entrance and offsite roadway widening of Lake Cook Road.                                                                                                                                                                                              

Drainage Study, Floodplain investigation, Property Condition Assessment, Drainage Plan, Site Circulation and Parking, Detention/Retention Basins, SWPPP and Best Management Practices, Right of Way Exhibits, Stormwater Management System, Drainage System Restoration, Final Engineering Construction Documents

Knight Transportation Headquarters – Site Improvements

Knight Transportation      Phoenix, Arizona

The improvements for the 80-acre corporate office building expansion including parking lot expansion and reconfiguration of onsite  vehicle traffic; the installation of an 8 foot segmented block retaining wall , parking lot lighting system and pedestrian system.

Conceptual Drainage Plan, Conceptual Site and Utility Layout, Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation , Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Fermilab – Access Roadway Alignment

Fermi National Accelerator Laboratory           Batavia, Illinois

The project consisted of investigative field work and establishment of various access roadway alignments for proposed grading and paving improvements to the campus access roadway system. The main focus of the investigation was on Road A and Road C to align with the main Research & Development facility.

Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Roadway alignment

Abbott Laboratories – Campus Access Road Investigation

Abbott Laboratories       Abbott Park, Illinois

The Research & Development campus Master plan required site investigation services to establish roadway alignments for proposed access road improvements and main entrance modifications for future vehicle level of service..  The campus is located at 100 Abbott Park Road.

Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Roadway alignment, Site Circulation and Parking, Preliminary Engineering

Nursing Division Facility – Site Improvements

Village of Schaumburg      Schaumburg, Illinois

The project site design included the expansion and reconfiguration of the existing parking lot. Site improvements included: relocation of site lighting and re surfacing of the facility access road.

Drainage Plan, Site Circulation and Parking, Final Engineering Construction Documents, Bid Procurement, Contract Administration