Fermilab – Access Roadway Alignment

Fermi National Accelerator Laboratory           Batavia, Illinois

The project consisted of investigative field work and establishment of various access roadway alignments for proposed grading and paving improvements to the campus access roadway system. The main focus of the investigation was on Road A and Road C to align with the main Research & Development facility.

Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Roadway alignment

Abbott Laboratories – Campus Access Road Investigation

Abbott Laboratories       Abbott Park, Illinois

The Research & Development campus Master plan required site investigation services to establish roadway alignments for proposed access road improvements and main entrance modifications for future vehicle level of service..  The campus is located at 100 Abbott Park Road.

Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Roadway alignment, Site Circulation and Parking, Preliminary Engineering