Running Horse at Arrowhead

Professional Development Services      Peoria, Arizona

The Running Horse at Arrowhead HOA and property management company needed a preliminary site assessment to determine the proper course of action to create additional open-space within the largest common area corridor.  An existing hardscape water feature and subsequent retention storage requirements along the entire length of the main open corridor restricted the recreational use for the residents within the single-family gated community.

Topographic Design Conditions, Preliminary Storm water Site Assessment

 

Casa Del Rio

Senexus Properties – Mira Bella Builders            Peoria, Arizona

The proposed recreational facility expansion and new covered pedestrian access improvements to an existing 200-unit Senior living apartment complex required ROI solution by JUDD Services.  Creative site hydraulic modifications to the original storm water retention and shared parking lot facilities now provides pedestrian access to beautiful open-space areas.

Property Condition Assessments, Topographic Design Conditions, Value-Engineering, Preliminary Drainage Report, Site hydraulic calculations and Retention basin in-series design, Erosion Control with BMP, Final Grading & Drainage Construction Documents, Stormwater Management Systems, Plan Quantities, Permit Facilitation, and Construction Observation

Kampgrounds of America – Infrastructure Improvements

Neil Borkan-Developer       Iron River, Michigan

Roadway and utility infrastructure improvements on a 1,200-acre parcel for a proposed campground facility with a Main Guard Station, Motel, Clubhouse, Cabin area, RV area, and Tent area.  Design services included: sanitary and water main extensions; Mass grading plan; Rural collector road infrastructure and service access aisle to various facility areas; parking lots and site circulation, Open-ditch storm water management system, and the preparation of final construction documents, details and specifications. Contact: Neil Borkan, 1020 Milwaukee AVE Suite 360, Deerfield, IL

Property Condition Assessments, Conceptual Drainage Plan, Conceptual Utility main and service Layouts, Site Circulation, Wastewater Capacity Analysis, Wastewater Master Planning, Water Master Planning, Water Resource Planning, Preliminary Drainage Report, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management Systems, Utility Services Layout, Wastewater Collection Systems, Wastewater interceptor improvements, Water Distribution Systems, Water Network Analysis, Water Transmission Mains, Drainage System Restoration, Plan Quantities, Estimate of Probable Cost

 

Harper College-Master Stormwater Report

Harper Community College     Schaumburg, Illinois

The project consisted of the elimination of localized flooding on campus and adjacent private property.  Hydraulic & Hydrology studies were performed to provide design standards for Stormwater management system modifications.  Improvements included site re-grading and ditch conveyance channelization.

Property Condition Assessment, Conceptual Drainage Plan, Development Constraint Report, Master Drainage Studies, Constructability Reviews, Design Standards, Permit Facilitation and Compliance, Project Compliance reviews, Regulatory Compliance Review

Judson University – Lindner Fitness Center

Judson University      Elgin, Illinois

The design of site improvements were for a new 150,000 square foot recreation facility in the center of the college campus.  Services included the design of utility infrastructure improvements, the design of an access road and the proposed parking lot.

Contact: Joe Evers, City Engineer of Elgin

Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation, Stormwater Management System, Utility Services Layout, Drainage System Public Participation coordination, Final Engineering Construction Documents

University Center – College of Lake County

College of Lake County     Grayslake, Illinois

The three story, 91,000 SF University Center contains two computer labs, two distance learning labs, a science lab, a tiered lecture hall, a nursing lab, a library, and a theater-style lecture hall. The new University Center of Lake County classroom building is located on CLC’s Grayslake Campus, at 1200 University Center Drive.                                                                   

Property Condition Assessment, Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Site and Utility Layout, Development Constraint Report, Site Circulation and Parking, Preliminary Engineering, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Regulatory Compliance Review.

Wolters Kluwer Financial – Campus Improvements

Wolters Kluwer Financial       Riverwoods, Illinois

A building expansion of the corporate campus required investigation and design of storm water drainage and vehicle capacity modifications.  Site Improvements included a 300-car parking lot expansion, Hydraulic analysis of the existing campus drainage system, reconstruction of the signalized campus entrance and offsite roadway widening of Lake Cook Road.                                                                                                                                                                                              

Drainage Study, Floodplain investigation, Property Condition Assessment, Drainage Plan, Site Circulation and Parking, Detention/Retention Basins, SWPPP and Best Management Practices, Right of Way Exhibits, Stormwater Management System, Drainage System Restoration, Final Engineering Construction Documents

Knight Transportation Headquarters – Site Improvements

Knight Transportation      Phoenix, Arizona

The improvements for the 80-acre corporate office building expansion including parking lot expansion and reconfiguration of onsite  vehicle traffic; the installation of an 8 foot segmented block retaining wall , parking lot lighting system and pedestrian system.

Conceptual Drainage Plan, Conceptual Site and Utility Layout, Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation , Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Brighton Gardens Assisted Living

Marriott International         St. Charles, Illinois

The site improvements for the new assisted living facility included a contoured walking trail and a loading dock area.  A Return on Investment solution for this project was the placement of emergency access pavers on a restricted access site  in lieu of a perimeter ring road.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Preliminary Engineering, Site Retrofit, Stormwater Management System, Utility Services Layout, Final Engineering Construction Documents