345 Villas

One Green Development                 Mesa, Arizona

The in-fill revitalization project consisted of 17 townhome units with attached 2-car garage and individual rear yards.  The site amenities included a recreational area with ramada and a shared secondary access to accommodate the proposed site circulation and existing access conditions of the adjacent properties.  The 2 multi-story buildings included front and rear patios.

Site Due Diligence, Project Feasibility, Property Condition Assessments, Topographic Design Conditions, Water main Network Analysis, Hydrant Flow AssessmentConceptual Drainage Plan, Conceptual Site Plan and Utility Layout, Development Constraint Reports, Site Circulation, Parking Analysis, Wastewater Capacity Analysis, Preliminary Drainage Report, Budget Bid Procurement, Easement Acquisition coordination, Entitlement Coordination, Public Participation Coordination

ASSOCIATE SERVICES ALTA/Boundary Survey, Geotechnical Report

 

First Watch Daytime Care

Hannay Realty Advisors     Phoenix, Arizona

The in-line store front tenant improvements required the placement of new sewer and water services.  The new tenant sewer service required the placement of a 1,000-gal grease trap and the water service required an extended meter bank at the public right of way.

Topographic field investigation, Final Utility Service Improvement Plans,Plan Quantities, Estimate of Probable Cost

 

Kampgrounds of America – Infrastructure Improvements

Neil Borkan-Developer       Iron River, Michigan

Roadway and utility infrastructure improvements on a 1,200-acre parcel for a proposed campground facility with a Main Guard Station, Motel, Clubhouse, Cabin area, RV area, and Tent area.  Design services included: sanitary and water main extensions; Mass grading plan; Rural collector road infrastructure and service access aisle to various facility areas; parking lots and site circulation, Open-ditch storm water management system, and the preparation of final construction documents, details and specifications. Contact: Neil Borkan, 1020 Milwaukee AVE Suite 360, Deerfield, IL

Property Condition Assessments, Conceptual Drainage Plan, Conceptual Utility main and service Layouts, Site Circulation, Wastewater Capacity Analysis, Wastewater Master Planning, Water Master Planning, Water Resource Planning, Preliminary Drainage Report, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management Systems, Utility Services Layout, Wastewater Collection Systems, Wastewater interceptor improvements, Water Distribution Systems, Water Network Analysis, Water Transmission Mains, Drainage System Restoration, Plan Quantities, Estimate of Probable Cost

 

Lincolnwood Town Center –Infrastructure Improvements

Turner Development      Lincolnwood, Illinois

Project engineer for sanitary and water extensions. Out-lot grading plans.  Preparations of permit applications; Construction observation; site plan design for auto dealership and nursing home facilities on the out-lot parcels.

P2500.89

Water main Network Analysis Final Engineering Construction Documents, Utility Services Layout, Wastewater Collection System, Water Distribution System, Water Network Analysis

The streets of Woodfield – Infrastructure Improvements

The Tucker Company         Schaumburg, Illinois

Formerly One Schaumburg Place, included the design of site improvements for enclosed retail mall, 2 parking garages and 7-story office building and a proposed hotel. The offsite infrastructure improvements included the widening of 2 existing IDOT roadways along IL Route 53 frontage road and Higgins Road, the extension of Martingale Road, the abandonment of an existing lift station, and the rerouting of a 54 inch storm sewer; design of a 350-car parking lot. The design included the extension of the existing sanitary and watermain system and the construction of 2 detention facilities

P1250.90

Site Circulation and Parking, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Water Distribution System

Judson University – Lindner Fitness Center

Judson University      Elgin, Illinois

The design of site improvements were for a new 150,000 square foot recreation facility in the center of the college campus.  Services included the design of utility infrastructure improvements, the design of an access road and the proposed parking lot.

Contact: Joe Evers, City Engineer of Elgin

Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation, Stormwater Management System, Utility Services Layout, Drainage System Public Participation coordination, Final Engineering Construction Documents

University Center – College of Lake County

College of Lake County     Grayslake, Illinois

The three story, 91,000 SF University Center contains two computer labs, two distance learning labs, a science lab, a tiered lecture hall, a nursing lab, a library, and a theater-style lecture hall. The new University Center of Lake County classroom building is located on CLC’s Grayslake Campus, at 1200 University Center Drive.                                                                   

Property Condition Assessment, Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Site and Utility Layout, Development Constraint Report, Site Circulation and Parking, Preliminary Engineering, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Regulatory Compliance Review.

Willow Creek Church – 7,300-seat Auditorium

Willow Creek Church     Barrinton, Illinois

The onsite and offsite site improvements for the new auditorium and office/classroom wing included the conversion of an existing deep & shallow well system to a proposed potable Water Main System with booster station and 2,600 linear feet of offsite water main.  The building additions required the relocation of existing utilities; the reconfiguration of access and parking facilities; capacity analysis and existing lift station pump modifications; and a water network analysis of the municipal system.

Gross/Pasma Blomquist Architects. Pepper Construction. Contact Scott Troeger, 847-765-0100

Property Condition Assessment, Conceptual Utility Layout, Development Constraint Report, Wastewater Capacity Analysis, Wastewater Master Planning, Water Master Planning, Final Engineering Construction Documents, Utility Services Layout, Wastewater Collection System, Wastewater Lift Station, Water Distribution System, Water Network Analysis, Regulatory Compliance Review

Knight Transportation Headquarters – Site Improvements

Knight Transportation      Phoenix, Arizona

The improvements for the 80-acre corporate office building expansion including parking lot expansion and reconfiguration of onsite  vehicle traffic; the installation of an 8 foot segmented block retaining wall , parking lot lighting system and pedestrian system.

Conceptual Drainage Plan, Conceptual Site and Utility Layout, Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation , Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Lincolnwood Place – Nursing Home

Lincolnwood Place      Lincolnwood, Illinois

The project consisted of the rough grading and utility extensions to the out-lot parcel for a future multi-story nursing home facility.  The infrastructure and grading were based upon an analysis of a  retrofit building design.

Pad-ready Drainage Plan, Site Retrofit, Utility Services Layout, Final Grading Construction Documents