GO AZ Motorcycles

K&I Architects | Interiors     Peoria, Arizona

The site improvements for the redevelopment of a 16,500 SF commercial facility and a proposed 10,700 SF building expansion included site circulation, parking and storm water management enhancements. The storm water ROI solutions for the hardscape intensive project resulted in the utilization of a multi-tier landscape basin configuration and underground storage system.  Architectural site elements were incorporated to maximize the quality of the site design.

Property Condition Assessments, Hydrant Flow Assessment, Preliminary Drainage Report, Detention/Retention Basins, Erosion Control with BMP, Final Site Improvement Plans, Stormwater Management Systems, Drainage System Restoration, Plan Quantities, Permit Facilitation

McDowell Mountain Marketplace – The VIG

YAM Properties     Scottsdale, Arizona

Property Condition Assessments, Topographic Design Conditions, Water main Network Analysis, Conceptual Drainage Plan, Conceptual Site Plan and Utility Layout, Preliminary Drainage Report, Slope Stabilization Analysis, Design Development Plans, Final Site Improvement Plans, Fire Line Plan, FAA Avigation Easement, Right of Way Exhibits, Stormwater Management Systems, Utility Services Layout, Wastewater Collection Systems, Plan Quantities, Easement Acquisition, Construction Observation, Stormwater Pollution Prevention Plan, ALTA/Boundary Survey, Map of Dedication, Geotechnical Report,

Carolina’s Mexican Food

Carolina’s Mexican Food       Avondale, Arizona

The 7,000 SF free standing restaurant is located at the intersection of Dysart Road and Western Avenue in Avondale.  Site improvements included 2 new commercial access entrances; a combination at-grade & underground retention system; storm water management collection with drywell system and sidewalk streetscape improvements.

Property Existing Condition Assessments, Hydrant fire flow Assessment, Wastewater Capacity Analysis, Water Resource Planning, Preliminary Drainage Report

Detention/Retention site hydraulic calculations, Erosion Control with BMP, Final Engineering Construction Documents, Design Development Plans, Final Site Improvement Plans, Grading & Drainage plan, Fire Line Plan, Stormwater Management Systems, Utility Services Layout, Wastewater Collection Systems, Plan Quantities, Estimate of Probable Cost, Construction Observation, Stormwater Pollution Prevention Plan, Project Close-out certification, As-Built Record Drawings,

ASSOCIATE SERVICES Geotechnical Report, Environmental Phase I Report, Traffic Impact Statement,

First Watch Daytime Care

Hannay Realty Advisors     Phoenix, Arizona

The in-line store front tenant improvements required the placement of new sewer and water services.  The new tenant sewer service required the placement of a 1,000-gal grease trap and the water service required an extended meter bank at the public right of way.

Topographic field investigation, Final Utility Service Improvement Plans,Plan Quantities, Estimate of Probable Cost

 

Lincolnwood Town Center –Infrastructure Improvements

Turner Development      Lincolnwood, Illinois

Project engineer for sanitary and water extensions. Out-lot grading plans.  Preparations of permit applications; Construction observation; site plan design for auto dealership and nursing home facilities on the out-lot parcels.

P2500.89

Water main Network Analysis Final Engineering Construction Documents, Utility Services Layout, Wastewater Collection System, Water Distribution System, Water Network Analysis

The streets of Woodfield – Infrastructure Improvements

The Tucker Company         Schaumburg, Illinois

Formerly One Schaumburg Place, included the design of site improvements for enclosed retail mall, 2 parking garages and 7-story office building and a proposed hotel. The offsite infrastructure improvements included the widening of 2 existing IDOT roadways along IL Route 53 frontage road and Higgins Road, the extension of Martingale Road, the abandonment of an existing lift station, and the rerouting of a 54 inch storm sewer; design of a 350-car parking lot. The design included the extension of the existing sanitary and watermain system and the construction of 2 detention facilities

P1250.90

Site Circulation and Parking, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Water Distribution System

Greenway Village Center

ServiceStar Development        Bolingbrook, Illinois

A Return on Investment solution for this 20-acre Mixed-Use Office/Retail Center included the mitigation of flood waters to reclaim 28% of the site buildable area.  Onsite and offsite  improvements including the design of adjacent roadways, water mains, sanitary and storm sewers, and an Intersection Design Study of IL. Route 59 and 111th Street.  Review agencies included: Village of Bolingbrook, FEMA, Will County DOT, Illinois DOT and Illinois Environmental Protection Agency.

P1250.04

Feasibility Report, Floodplain Study, Water main Capacity Analysis, Public Participation coordination, Grading & Drainage Plan, Site and Utility Layout, Site Circulation and Parking, CLOMR-(Conditional Letter of Map Revisions, Detention/Retention Basins, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater

Corcovado Village Shopping Center

The Bunch Companies    Phoenix, Arizona 

Located at the intersection of Warner Road and McQueen Road in Chandler.  Project included the design of water main, sanitary sewer, paving, and drainage improvements for two free standing commercial buildings with approximately 17,650 square feet of building area combined.  This project incorporated underground storage for storm water retention, required a lot split, and featured a free standing drive-thru entry monument arch.

P800.05

Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Stormwater Pollution Prevention Plans (SWPPP)

Town Square Redevelopment

Village of Schaumburg      Schaumburg, Illinois

Redevelopment project consisted of the demolition of an existing shopping center at the southwest corner of Schaumburg Road and Roselle Road in Schaumburg. The TIF improvements to the Village owned 20 acre parcel included a 60-foot clock tower, utility infrastructure improvements, a grocery store, retail buildings, and the conversion of an existing pond into a multi-functional park facility. The park included an outdoor Amphitheater, a gazebo, a pedestrian walkway system with bridge, and a pond with a waterfall.

P2500.97

Water main Network Analysis,  Drainage System Restoration  Bid Procurement , Contract Administration, Constructability Reviews, Design Standards, Easement Acquisitions, Permit Facilitation and Compliance, Project Compliance reviews, Project Management – Preconstruction, Public Participation coordination, Regulatory Compliance Review, Underground Utility Coordination, Value Engineering, Construction Coordination Manager, Bid procurement

Desert Foothills Shopping Center

The Bunch Companies     Phoenix, Arizona

Design of a 15-acre commercial site at the intersection of Desert Foothills parkway and Chandler Boulevard in Phoenix. Project included design of public roadways, water main, sanitary sewer, storm water retention, half-street improvements of Desert Foothills Boulevard, and storm water pollution prevention plan.  Review agencies included:  City of Phoenix and Maricopa County Department of Environmental Services.

P850.06

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Water Distribution System