Brighton Gardens Assisted Living

Marriott International         St. Charles, Illinois

The site improvements for the new assisted living facility included a contoured walking trail and a loading dock area.  A Return on Investment solution for this project was the placement of emergency access pavers on a restricted access site  in lieu of a perimeter ring road.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Preliminary Engineering, Site Retrofit, Stormwater Management System, Utility Services Layout, Final Engineering Construction Documents

Prairie Center of the Art – Building Expansion

Village of Schaumburg          Schaumburg, Illinois

The new Center for the Arts building required the expansion and reconfiguration of the existing parking lot, relocation of site lighting, the extension of an existing water main, the placement of new service lines, resurfacing of the Municipal Center access road and improvements to the existing pedestrian walkway on the Municipal campus.

Property Condition Assessment, Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Final Engineering Construction Documents, Site Renovation , Stormwater Management System, Utility Services Layout, Contract Administration, Resident Engineer