Kampgrounds of America – Infrastructure Improvements

Neil Borkan-Developer       Iron River, Michigan

Roadway and utility infrastructure improvements on a 1,200-acre parcel for a proposed campground facility with a Main Guard Station, Motel, Clubhouse, Cabin area, RV area, and Tent area.  Design services included: sanitary and water main extensions; Mass grading plan; Rural collector road infrastructure and service access aisle to various facility areas; parking lots and site circulation, Open-ditch storm water management system, and the preparation of final construction documents, details and specifications. Contact: Neil Borkan, 1020 Milwaukee AVE Suite 360, Deerfield, IL

Property Condition Assessments, Conceptual Drainage Plan, Conceptual Utility main and service Layouts, Site Circulation, Wastewater Capacity Analysis, Wastewater Master Planning, Water Master Planning, Water Resource Planning, Preliminary Drainage Report, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management Systems, Utility Services Layout, Wastewater Collection Systems, Wastewater interceptor improvements, Water Distribution Systems, Water Network Analysis, Water Transmission Mains, Drainage System Restoration, Plan Quantities, Estimate of Probable Cost

 

Phoenix College – Campus Parking Structure

Phoenix College      Phoenix, Arizona

The project consisted of a proposed 350-car parking garage and the reconfiguration of the existing at-grade parking lot. Services included site investigation of the existing campus and preliminary layout to maximize the cost benefit of a multi-story parking garage.

Property Condition Assessment, Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Site and Utility Layout, Development Constraint Report, Site Circulation and Parking, Preliminary Engineering

Lincolnwood Town Center –Infrastructure Improvements

Turner Development      Lincolnwood, Illinois

Project engineer for sanitary and water extensions. Out-lot grading plans.  Preparations of permit applications; Construction observation; site plan design for auto dealership and nursing home facilities on the out-lot parcels.

P2500.89

Water main Network Analysis Final Engineering Construction Documents, Utility Services Layout, Wastewater Collection System, Water Distribution System, Water Network Analysis

The streets of Woodfield – Infrastructure Improvements

The Tucker Company         Schaumburg, Illinois

Formerly One Schaumburg Place, included the design of site improvements for enclosed retail mall, 2 parking garages and 7-story office building and a proposed hotel. The offsite infrastructure improvements included the widening of 2 existing IDOT roadways along IL Route 53 frontage road and Higgins Road, the extension of Martingale Road, the abandonment of an existing lift station, and the rerouting of a 54 inch storm sewer; design of a 350-car parking lot. The design included the extension of the existing sanitary and watermain system and the construction of 2 detention facilities

P1250.90

Site Circulation and Parking, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Water Distribution System

Greenway Village Center

ServiceStar Development        Bolingbrook, Illinois

A Return on Investment solution for this 20-acre Mixed-Use Office/Retail Center included the mitigation of flood waters to reclaim 28% of the site buildable area.  Onsite and offsite  improvements including the design of adjacent roadways, water mains, sanitary and storm sewers, and an Intersection Design Study of IL. Route 59 and 111th Street.  Review agencies included: Village of Bolingbrook, FEMA, Will County DOT, Illinois DOT and Illinois Environmental Protection Agency.

P1250.04

Feasibility Report, Floodplain Study, Water main Capacity Analysis, Public Participation coordination, Grading & Drainage Plan, Site and Utility Layout, Site Circulation and Parking, CLOMR-(Conditional Letter of Map Revisions, Detention/Retention Basins, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater

Corcovado Village Shopping Center

The Bunch Companies    Phoenix, Arizona 

Located at the intersection of Warner Road and McQueen Road in Chandler.  Project included the design of water main, sanitary sewer, paving, and drainage improvements for two free standing commercial buildings with approximately 17,650 square feet of building area combined.  This project incorporated underground storage for storm water retention, required a lot split, and featured a free standing drive-thru entry monument arch.

P800.05

Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Stormwater Pollution Prevention Plans (SWPPP)

Town Square Redevelopment

Village of Schaumburg      Schaumburg, Illinois

Redevelopment project consisted of the demolition of an existing shopping center at the southwest corner of Schaumburg Road and Roselle Road in Schaumburg. The TIF improvements to the Village owned 20 acre parcel included a 60-foot clock tower, utility infrastructure improvements, a grocery store, retail buildings, and the conversion of an existing pond into a multi-functional park facility. The park included an outdoor Amphitheater, a gazebo, a pedestrian walkway system with bridge, and a pond with a waterfall.

P2500.97

Water main Network Analysis,  Drainage System Restoration  Bid Procurement , Contract Administration, Constructability Reviews, Design Standards, Easement Acquisitions, Permit Facilitation and Compliance, Project Compliance reviews, Project Management – Preconstruction, Public Participation coordination, Regulatory Compliance Review, Underground Utility Coordination, Value Engineering, Construction Coordination Manager, Bid procurement

Desert Foothills Shopping Center

The Bunch Companies     Phoenix, Arizona

Design of a 15-acre commercial site at the intersection of Desert Foothills parkway and Chandler Boulevard in Phoenix. Project included design of public roadways, water main, sanitary sewer, storm water retention, half-street improvements of Desert Foothills Boulevard, and storm water pollution prevention plan.  Review agencies included:  City of Phoenix and Maricopa County Department of Environmental Services.

P850.06

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Water Distribution System

Harper College-Master Stormwater Report

Harper Community College     Schaumburg, Illinois

The project consisted of the elimination of localized flooding on campus and adjacent private property.  Hydraulic & Hydrology studies were performed to provide design standards for Stormwater management system modifications.  Improvements included site re-grading and ditch conveyance channelization.

Property Condition Assessment, Conceptual Drainage Plan, Development Constraint Report, Master Drainage Studies, Constructability Reviews, Design Standards, Permit Facilitation and Compliance, Project Compliance reviews, Regulatory Compliance Review

Judson University – Lindner Fitness Center

Judson University      Elgin, Illinois

The design of site improvements were for a new 150,000 square foot recreation facility in the center of the college campus.  Services included the design of utility infrastructure improvements, the design of an access road and the proposed parking lot.

Contact: Joe Evers, City Engineer of Elgin

Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation, Stormwater Management System, Utility Services Layout, Drainage System Public Participation coordination, Final Engineering Construction Documents