Abbott Laboratories – Campus Access Road Investigation

Abbott Laboratories       Abbott Park, Illinois

The Research & Development campus Master plan required site investigation services to establish roadway alignments for proposed access road improvements and main entrance modifications for future vehicle level of service..  The campus is located at 100 Abbott Park Road.

Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Roadway alignment, Site Circulation and Parking, Preliminary Engineering

Lincolnwood Place – Nursing Home

Lincolnwood Place      Lincolnwood, Illinois

The project consisted of the rough grading and utility extensions to the out-lot parcel for a future multi-story nursing home facility.  The infrastructure and grading were based upon an analysis of a  retrofit building design.

Pad-ready Drainage Plan, Site Retrofit, Utility Services Layout, Final Grading Construction Documents

Nursing Division Facility – Site Improvements

Village of Schaumburg      Schaumburg, Illinois

The project site design included the expansion and reconfiguration of the existing parking lot. Site improvements included: relocation of site lighting and re surfacing of the facility access road.

Drainage Plan, Site Circulation and Parking, Final Engineering Construction Documents, Bid Procurement, Contract Administration

Arden Courts of Northbrook

HCR  Manorcare          Northbrook, Illinois

A creativity and innovative approach was required to achieve the site improvements surrounding the intricate building design and the problematic parcel configuration.  The result is a campus that looks and functions beautifully.  The site is located at 3240 Milwaukee Avenue.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Detention Basins, Erosion Control and Best Management Practices, Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Condell Medical Center – Parking Expansion

Advocate Condell Medical Center           Libertyville, Illinois

The 250,000 sq.ft. building addition to the Condell Medical Center campus required the reconfiguration and expansion of the existing parking lot.  Paving and grading plans were designed to achieve the required parking per the zoning regulations.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Final Engineering Construction Documents

Brighton Gardens Assisted Living

Marriott International         St. Charles, Illinois

The site improvements for the new assisted living facility included a contoured walking trail and a loading dock area.  A Return on Investment solution for this project was the placement of emergency access pavers on a restricted access site  in lieu of a perimeter ring road.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Preliminary Engineering, Site Retrofit, Stormwater Management System, Utility Services Layout, Final Engineering Construction Documents