Corcovado Village Shopping Center

The Bunch Companies    Phoenix, Arizona 

Located at the intersection of Warner Road and McQueen Road in Chandler.  Project included the design of water main, sanitary sewer, paving, and drainage improvements for two free standing commercial buildings with approximately 17,650 square feet of building area combined.  This project incorporated underground storage for storm water retention, required a lot split, and featured a free standing drive-thru entry monument arch.

P800.05

Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Stormwater Pollution Prevention Plans (SWPPP)

Town Square Redevelopment

Village of Schaumburg      Schaumburg, Illinois

Redevelopment project consisted of the demolition of an existing shopping center at the southwest corner of Schaumburg Road and Roselle Road in Schaumburg. The TIF improvements to the Village owned 20 acre parcel included a 60-foot clock tower, utility infrastructure improvements, a grocery store, retail buildings, and the conversion of an existing pond into a multi-functional park facility. The park included an outdoor Amphitheater, a gazebo, a pedestrian walkway system with bridge, and a pond with a waterfall.

P2500.97

Water main Network Analysis,  Drainage System Restoration  Bid Procurement , Contract Administration, Constructability Reviews, Design Standards, Easement Acquisitions, Permit Facilitation and Compliance, Project Compliance reviews, Project Management – Preconstruction, Public Participation coordination, Regulatory Compliance Review, Underground Utility Coordination, Value Engineering, Construction Coordination Manager, Bid procurement

Desert Foothills Shopping Center

The Bunch Companies     Phoenix, Arizona

Design of a 15-acre commercial site at the intersection of Desert Foothills parkway and Chandler Boulevard in Phoenix. Project included design of public roadways, water main, sanitary sewer, storm water retention, half-street improvements of Desert Foothills Boulevard, and storm water pollution prevention plan.  Review agencies included:  City of Phoenix and Maricopa County Department of Environmental Services.

P850.06

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Preliminary Engineering, Final Engineering Construction Documents, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Water Distribution System

Judson University – Lindner Fitness Center

Judson University      Elgin, Illinois

The design of site improvements were for a new 150,000 square foot recreation facility in the center of the college campus.  Services included the design of utility infrastructure improvements, the design of an access road and the proposed parking lot.

Contact: Joe Evers, City Engineer of Elgin

Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation, Stormwater Management System, Utility Services Layout, Drainage System Public Participation coordination, Final Engineering Construction Documents

University Center – College of Lake County

College of Lake County     Grayslake, Illinois

The three story, 91,000 SF University Center contains two computer labs, two distance learning labs, a science lab, a tiered lecture hall, a nursing lab, a library, and a theater-style lecture hall. The new University Center of Lake County classroom building is located on CLC’s Grayslake Campus, at 1200 University Center Drive.                                                                   

Property Condition Assessment, Topographic Site Conditions, Conceptual Drainage Plan, Conceptual Site and Utility Layout, Development Constraint Report, Site Circulation and Parking, Preliminary Engineering, Stormwater Management System, Utility Services Layout, Wastewater Collection System, Regulatory Compliance Review.

Knight Transportation Headquarters – Site Improvements

Knight Transportation      Phoenix, Arizona

The improvements for the 80-acre corporate office building expansion including parking lot expansion and reconfiguration of onsite  vehicle traffic; the installation of an 8 foot segmented block retaining wall , parking lot lighting system and pedestrian system.

Conceptual Drainage Plan, Conceptual Site and Utility Layout, Site Circulation and Parking, Detention/Retention Basins, Erosion Control and Best Management Practices, Site Renovation , Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Arden Courts of Northbrook

HCR  Manorcare          Northbrook, Illinois

A creativity and innovative approach was required to achieve the site improvements surrounding the intricate building design and the problematic parcel configuration.  The result is a campus that looks and functions beautifully.  The site is located at 3240 Milwaukee Avenue.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Detention Basins, Erosion Control and Best Management Practices, Stormwater Management System, Utility Services Layout, Design Standards, Final Engineering Construction Documents

Brighton Gardens Assisted Living

Marriott International         St. Charles, Illinois

The site improvements for the new assisted living facility included a contoured walking trail and a loading dock area.  A Return on Investment solution for this project was the placement of emergency access pavers on a restricted access site  in lieu of a perimeter ring road.

Drainage Plan, Site and Utility Layout, Site Circulation and Parking, Preliminary Engineering, Site Retrofit, Stormwater Management System, Utility Services Layout, Final Engineering Construction Documents