Wolters Kluwer Financial – Campus Improvements

Wolters Kluwer Financial       Riverwoods, Illinois

A building expansion of the corporate campus required investigation and design of storm water drainage and vehicle capacity modifications.  Site Improvements included a 300-car parking lot expansion, Hydraulic analysis of the existing campus drainage system, reconstruction of the signalized campus entrance and offsite roadway widening of Lake Cook Road.                                                                                                                                                                                              

Drainage Study, Floodplain investigation, Property Condition Assessment, Drainage Plan, Site Circulation and Parking, Detention/Retention Basins, SWPPP and Best Management Practices, Right of Way Exhibits, Stormwater Management System, Drainage System Restoration, Final Engineering Construction Documents

Download PDF Click Icon to Download PDF